K span construction guide

download

of 25

  • date post

    19-Aug-2014
  • Category

    Engineering
  • view

    150
  • download

    4

Embed Size (px)

description

Presentation about K span construction guide from www.large-span.com contact us by info@large-span.com largespangroup@gmail.com LARGE SPAN GROUP TEL: 0086-13333016262, 18731151165 FAX: 0086-18032909635, 18032909637 EMAIL: largespangroup@gmail.com, info@large-span.com Large-Span group is big stated owned corporation established over 30 years and has certificated by BV, TUV, SGS inspection. As one of the most famous manufacturers in China, we have committed ourselves to developing and producing high quality products, professional suggestions and good services for customers all over the world.

transcript

<ul><li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com INTRODUCTION OF K SPAN SYSTEM AND BUILDING GUIDANCE Automatic Building Machine </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com K-SPAN BUILDING K-SPAN building (fig.9-8)are a new form of construction. The intended uses of these buildings are for open storage; however, these building can be designed for use as office spaces, hangars, supple buildings, medical facilities, and more permanent structures. It is a self- contained, metal building manufacturing plant(Automatic Building Machine) mounted on a trailer, forming a type of mobile factory. There are two types of K-SPAN building machines, as shown in figures 9-9 and 9-10: the MIC 120 and the MIC 240 (Super Span). An interesting aspect of this machine is that it can be easily transported by air anywhere in the world. The ABM System has already been certified for air transport by the U.S. Air Force in C-130, C-141, and C-5 aircraft. K-SPAN Buildings </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Operating Instructions </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Training Training personnel in the operation of all related K-SPAN equipment is essential. The formal training of K-SPAN construction is held at both NCRs. Crew members and leaders, once trained, can instruct other members of the crew in the safe fabrication and erection of a K-SPAN. Each regiment has personnel certified by LARGE SPAN GROUP Industries to instruct this training. The training provided to you is not to be taken as the absolute and only way to construct the K-SPAN. As in the case of most construction procedures, there are several different ways to accomplish the task. Crew size, experience, and type of equipment available may alter the way you perform the task; however, you should achieve the same end results. Table below shows the personnel and skills required to erect this building. PERSONNEL SKILL REQUIREMENTS ENGINEER (Not required on a full-time basis) May be required to engineer and design foundation and special applications PROJECT MANAGER OR CREW LEADER Oversees all phases of construction including machinery transportation and operations. Maintains working knowledge of all tools, equipment, and building construction. Must also be familiar with the ABM machinery. Knows and enforces all SAFETY rules and regulations TRUCK/CRANE OPERATOR Loads material onto machine and transport equipment. Places arched panels on foundations. Tows machinery between jobsites. Make sure machinery is in proper working order and is certified in crane operation. Complies with all SAFETY procedures. WELDER Must have a working knowledge of welding, cutting, and fabrication of light steel. Must be familiar with welder/generator operations and maintenance. CONSTRUCTION MECHANIC Successfully undergoes special training on the ABM machine (training should be conducted by either the REGIMENTs or by the MANUFACTURE). Must be thoroughly familiar with the OPERATING MANUAL. GENERAL LABORER Should be familiar with general construction techniques. Must OBEY all safety rules and regulations. To determine the amount of laborers (fig. 9-11) required for the job, divide the weight of steel by 50. </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Operating Instructions The main component of the K-SPAN system is the trailer-mounted building machine (fig. 9-12). This figure shows the main components of the trailer and general operating instructions. The primary position of the operators station is located at the rear of the trailer. The crew member selected for this position must have a thorough understanding of the machine operations and manuals. From that position, the operator controls all the elements required to form the panels. The operator must remain at the controls at all times. From the placement of the trailer on site to the completion of the curved panel, attention to detail is paramount as with all aspects of construction. As you operate the machine, you will be adjusting the various machine-operating components. Adjustment for the thickness, the radius, and the curving machine MUST be made according to the manuals. Do not permit shortcuts in adjustments. Any variations in adjustments, or disregard for the instructions found in the operating manuals, will leave you with a pile of useless material or an inconsistent building. Trailer-mounted machinery </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Foundation The design of the foundation for a K-SPAN building depends on the size of the building (MIC120 or MIC240), the existing soil conditions, and the wind load. The foundation must be approved by a certified engineer. The foundations for the buildings are easy to construct when you have the right equipment and crew. The roof and wall loads are transferred to the foundation through the base of each arch. Therefore, all loads are uniformly carried down each sidewall by continuous strip footing. The foundations are more economical than foundations of more convention buildings. The concrete forms and accessories provide sufficient material to form the foundations for a building 100 feet long by 50 feet wide. When a different configuration is required, forms are available from LARGE SPAN GROUP. The actual footing construction is based, as with all projects, on the plans and specifications. The location of the forms, the placement of steel, and the psi (pounds per square inch) of the concrete is critical. The building panels are welded to the angle in the footer before concrete placement. Because of this operation, all aspects of footer construction must be completely checked for alignment and squareness. Once concrete is placed, there is no way to correct errors. As mention above, forms are provided for the foundation. Using table 9-4 as a guide, figure 10-13 gives you a simple foundation layout by parts designation. As noted in figure 9-13, the cross pipes are not provided in the kit. They must be ordered when the project is being planned and estimated. </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Foundations </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Building Erection With the placement of the machinery and forming of the building panels in progress, your next considerations are the placement and the weight-lifting capabilities of the crane. Check the weight-lifting chart of the crane for its maximum weight capacity. This dictates the number of panels (recommend 5/ABM 120 and 3/ABM240) you can safely lift at the operating distance. As with all crane operations, attempting to lift more than the rated capacity can cause the crane to turn over. Attaching the spreader bar (fig.9-14) to the curved formed panels is a critical step; failure to clamp the panels tightly can cause the panels to slip and fall with potential harm to personnel and damage to the panels. With the guide ropes attached (fig 9-15) and personnel manning these ropes, lift the panels for placement. When the panels are lifted, lift only as high as necessary, position two men at each free and to guide the panels in place, and remind crew members to keep their feet from under the ends of the arches. You must never attempt to lift sets of panels in winds exceeding 20 mph. Place the first set of panels on the attaching angle of the foundation and position them so there will be room for the end-wall panels. After the first set of panels are positioned, clamp them to the angle, plumb with guide ropes, and secure the ropes to previously anchored stakes. Detach the spreader bar and continue to place the panel sets. Seam each set to the standing panels before detaching the spreader bar. After about 15 panels (three sets) are in place, measures the building length at both ends (just above forms) and at the center of the arch. This measurement will seldom be exactly 1 foot per panel (usually slightly more), but should be equal for each panel. Adjust the ends to equal the center measure. Panels are flexible enough to adjust slightly. Check these measurements periodically during building construction. Since exact building lengths are difficult to predict, the end wall attaching angle on the finishing end of the building should not be put in place until all panels are set. After the arches are in place, set the longest end-wall panel in the form, then plumb and clamp it in place. Work from the longest panel outward and be careful to maintain plumb. When all the building panels are welded to the attaching angle (fig. 9-16) at 12 inches on center, you are ready to place the concrete. When the concrete is placed, remember it is extremely important that it is well-vibrated. This helps eliminate voids under all embedded items. As the concrete begins to set, slope the top exterior portion of the concrete cap about 5 inches (fig. 9-17) to allow water to drain away from the building. The elevation and type of interior floor are not relevant as long as the finish of the interior floor is not higher than the top of the concrete cap. </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Building Erection </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Guide rope diagram </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Building foundation concept </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Concrete foundation </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Construction Details The K-SPAN building system is similar to other types of pre-engineered or prefabricated buildings in that windows, doors, and roll-up doors can be installed only when erection is completed. When insulation of the building is required, insulation boards (usually 4 by 8 feet) maybe of any semirigid material that can be bent to match the radius of the building. The insulation is installed using clips, as shown in figure 9-18. When the integrity of the end-wall panels is continuous from the ground to the roof line, the end wall become self-supporting. The installation of windows (fig. 9-19) and aluminum doors (fig. 9-20) presents no problem since the integrity of the wall system is not interrupted. The installation of the overhead door (fig. 9-21) does present a problem in that it does interrupt the integrity of the wall system. This situation is quickly overcome by the easily installed and adjustable (height and width) doorframe package that supports both the door and end wall. This doorframe package is offered by the manufacture. Construction Details </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032909635, 18032909637 E-MAIL: info@large-span.com, largespangroup@gmail.com Aluminum window installation </li> <li> LARGE SPAN GROUP ADD: No.11, Friendship Street, North Industrial Zone, Zhengding City, Hebei Province, China TEL: 0086 13333016262, 18731151165 FAX: 0086 18032...</li></ul>